Time and Materials, Lump Sum or Unit Rate: How to Write the Price Section of a Proposal

The four ways to price a contractor job (materials + labor, lump sum, time and materials, unit rate), when each fits, and a filled-in price section for each, with not-to-exceed caps and minimum charges.

Published November 11, 2026

Two contractors can quote the same job at the same number and still end up in very different places: one gets paid without an argument, the other spends a month explaining an invoice. The difference is usually the price section. How you price a job (one fixed figure, a breakdown, an hourly rate, or a rate per square foot) decides what the client thinks they agreed to, and that is what you will be held to when the job runs long.

This guide covers the four common ways to price a contractor job, when each one fits, and how to write the price section for each, with a filled-in example from one fictional contractor, Calder Home Repair & Remodeling in Columbus, Ohio. All the numbers are examples, not recommended rates. If you are still working out the number itself, start with how to price a remodeling job; this post is about how to put that number on paper.

The four ways to price a job, and when each fits

Materials + labor fits a job with a fixed scope you can measure and cost before you start: a bathroom remodel from drawings, a furnace swap, a roof tear-off. You show the client the two main parts and the total.

Lump sum is the same fixed scope with one all-in price and no breakdown. It suits jobs where a split would only invite line-by-line haggling, or where you simply sell on the finished result.

Time and materialsfits work where nobody can honestly know the scope until it is underway: leak repairs, troubleshooting, service calls, older-house surprises, anything that starts with "we'll open the wall and see." The client pays for the hours worked and the materials used. It is fair to both sides only when it has a ceiling, which is what a not-to-exceed amount is for.

Unit rate fits repetitive, measurable work: flooring per square foot, fence per linear foot, drywall per sheet, a price per fixture or per outlet. The client pays for the quantity actually installed. Small jobs need a minimum charge, because you still load the truck and drive out for 40 square feet.

A fixed price puts the risk of the unknown on you. Time and materials and unit rates move part of it to the client, which is why those two formats need more explaining on paper, not less.

1. Materials + labor

The client needs to see what the money buys: a materials figure, a labor figure and a total, with the scope above it detailed enough that both of you could point at a line and say "that is included." What protects you is an exclusions list and a change-order clause, so anything outside the written scope is priced separately rather than absorbed. Example: a full bathroom remodel for Dana Whitfield at 418 Linwood Ave.

Calder Home Repair & Remodeling · Columbus, OH · (614) 555-0118
Bathroom remodel, 418 Linwood Ave
INVESTMENT
Materials & Supplies$6,850
Labour & Installation$9,400
Total Investment$16,250
Plus applicable taxes.

2. Lump sum

One line, one number. Because there is no breakdown, the scope carries all the weight: what is included, which materials and grades, what is excluded, and how changes are priced. A lump sum with a thin scope is the easiest price in the world to argue about. Example: tearing out and rebuilding a pressure-treated deck for Ken and Adaeze Okafor.

Calder Home Repair & Remodeling · Columbus, OH · (614) 555-0118
Deck rebuild, 92 Sycamore Ct
INVESTMENT
Total Investment (lump sum)$18,500
Plus applicable taxes.

For how to pick between these two and set the number, see how to bid a construction job.

3. Time and materials

A time and materials price section has to answer five questions, or the client will answer them for you when the invoice arrives:

The hourly rate, and who it applies to. Per person on site or per crew hour is a big difference on a two-person job. Say which. How materials are billed: at cost, or at cost plus a markup you state as a percentage. An unstated markup looks like a hidden one. An estimate of hours and materials, clearly labelled as an estimate, so the client can budget. A not-to-exceed cap,and what happens as you approach it: you stop and get the client's written approval before going past it, rather than finishing and sending the overage. How time is recorded and billed: a daily log of who worked, how many hours, and on what, plus receipts for materials, shared at whatever interval you bill.

Example: Marcus Bell at 1607 Hollister Rd has water staining on a kitchen wall below an upstairs bathroom. The leak source is unknown until the drywall comes off. Calder prices it at $95 an hour per person, materials at cost plus 15%, an estimate of 60 hours and $1,800 of materials, and a $9,000 cap.

Calder Home Repair & Remodeling · Columbus, OH · (614) 555-0118
Leak investigation and wall repair, 1607 Hollister Rd
INVESTMENT
Labour rate: $95 per hour, per person
Materials: billed at cost plus 15%
Estimated hours: 60 at $95 per hour
Estimated labour$5,700
Estimated materials$1,800
Estimated total$7,500
Not to exceed $9,000 without written approval.
This is an estimate. The final amount is based on the actual hours worked and materials used.
Plus applicable taxes.

Notice the word "Estimated" on every figure that is not a rate, and the sentence that says how the final amount is set. That is what keeps a client from reading $7,500 as a promise. The cap is the part that gets you hired: it tells the client the worst case before they sign.

If you cannot give an estimate at all, a rates-only section is honest too: the rate, the materials basis, and the sentence about the final amount, with no total. Just do not invent one to look tidy.

4. Unit rate

A unit rate price section needs: the unit, spelled out (square foot of finished floor, linear foot of fence line, per fixture); the rate per unit; an estimated quantity, labelled as an estimate; how the final quantity is measured, for example measured on site after installation, with or without closets, waste or gates counted; and a minimum charge so a tiny final quantity still covers the trip and setup.

Example: luxury vinyl plank across the main floor for Priya Raman at 55 Kenwick Dr. Calder quotes $7 per square foot installed, an estimated 1,180 square feet, and a $1,500 minimum charge.

Calder Home Repair & Remodeling · Columbus, OH · (614) 555-0118
LVP flooring, 55 Kenwick Dr
INVESTMENT
Unit rate: $7 per square foot
Estimated quantity: 1,180 at $7 per square foot
Minimum charge: $1,500 regardless of the final quantity
Estimated total$8,260
This is an estimate. The final amount is based on the actual quantity completed.
Plus applicable taxes.

The measurement rule belongs in the scope or terms, in words: "Final quantity is measured on the installed floor and excludes areas under fixed cabinets." Without it, "1,180 square feet" becomes a negotiation at the end of the job.

The mistakes that start disputes

An estimate the client read as a quote.If the number is not labelled "estimated" and there is no sentence saying how the final amount is set, assume the client will treat it as fixed. No cap on time and materials. An open-ended hourly job is the one clients fear most, and the one they are most likely to dispute. An undefined markup."Materials billed as used" with a markup added later reads as a surprise charge. A unit nobody defined. Square feet of what, measured how, before or after waste? No minimum charge on unit work, so a job that shrinks on site stops covering your costs.

One more: these terms have legal weight, and the rules differ by state and province. Some places have specific requirements for home-improvement contracts, written estimates, deposits or cost-based pricing. Check your state or provincial rules (your licensing board or consumer protection office is the usual starting point) before you adopt a format, especially for residential work.

For the basics every quote needs regardless of how it is priced, see how to make a quote for a job. If you want to offer the client choices rather than one price, the good, better, best proposal shows how to lay out three options. And if you need to send a proposal before you have a price at all, a proposal can go out with the price to be confirmed after the site visit, covered in sending a quote before the site visit.

Doing it in ProposalPro

Since November 2026, a contractor proposal in ProposalPro can be priced all four ways. The form shows four choices: Materials + labour, Lump sum, Time and materials and Unit rate. For time and materials you enter an hourly rate (and whether it is per person or per crew) and an optional materials markup; for unit rate, a rate and what it is per. Under "Give the client a ballpark (optional)" you can add estimated hours, estimated materials and a not-to-exceed amount, or an estimated quantity and a minimum charge. In the guided interview you can just say it ("ninety-five an hour plus materials") and the price card shows what was heard before any number counts.

The money lines in the examples above are exactly what the app writes. The arithmetic is done in code, not by the AI, every estimate is labelled as an estimate (the PDF total reads ESTIMATED TOTAL), and a not-to-exceed amount below the estimate is flagged before you generate. With no estimate given, the proposal shows the rates only and never makes up a total. For the rest of the document around the price, see the contractor quote template, or the quote generator for a shorter one-page quote.

The honest limits: it is for contractor proposals only (consultant hourly fees are not covered); one rate line per proposal, so a job priced as sod per square foot plus trees each does not fit; days are not converted to hours; and once a proposal is generated the money section is plain text, so if you edit the rate by hand the estimate is not recalculated for you. Put your measurement rule and your "we stop and ask before passing the cap" terms in the Special Notes field, in words, so they land in the proposal.

Try it on your next odd job

Pick the job you have been putting off quoting because you do not know what is behind the wall, and price it as time and materials with a cap. You can start free and generate the proposal in a few minutes, then read the price section the way your client will.

Frequently asked questions

What is a time and materials proposal?

A time and materials proposal prices a job by an hourly labor rate plus the materials actually used, instead of one fixed price. A good one states who the rate applies to, how materials are billed (at cost or cost plus a stated markup), an estimate labelled as an estimate, and usually a not-to-exceed cap.

What is the difference between time and materials and a fixed price or lump sum?

A fixed price or lump sum is one agreed amount for a defined scope, so the contractor carries the risk of unknowns. Time and materials bills the actual hours and materials, so it suits repairs and work where the scope cannot be known until the job is opened up.

What does not to exceed mean in a contractor proposal?

A not-to-exceed amount is a cap on a time and materials job: the contractor stops and gets the client's written approval before the bill goes past it. Whether and how such a cap binds depends on your contract and local rules, so check the requirements in your state or province.

What is a unit rate or unit price proposal?

A unit rate proposal prices work per measurable unit, such as per square foot of flooring or per linear foot of fence, and the final amount follows the quantity actually completed. It should define the unit, say how the final quantity is measured, label any quantity estimate as an estimate, and set a minimum charge for small jobs.

Can ProposalPro write a time and materials or unit rate proposal?

Yes. Since November 2026 a contractor proposal can be priced as materials + labour, lump sum, time and materials or unit rate, and the app calculates every estimate in code and labels it as an estimate. Limits: contractor proposals only, one rate line per proposal, days are not converted to hours, and the estimate is not recalculated if you edit the money text after generating.